| A few years ago, this was a 3' diameter concrete culvert. Today, it's packed with freeway sediment. |
| This picture gives some perspective on how large the sediment "beach" is, at least the above water line. |
This was my first opportunity to see the Little Canada-funded Gopher Electronics parking lot drainage plan and I'm not particularly impressed. We gave this design a shot on the drainage pipe at the south end of our property about 12 years ago and it worked for a season, but was quickly overwhelmed by the quantity of sediment pouring into the lake from Lake Shore Ave and the sediment "island" has continued to expand since. This design is not a "trap," but is more like a temporary diversion with a little landscaping.
Sediment traps are either holding ponds, like those we see along the eastbound sections of the new I694 design, or complicated concrete affairs that have to be regularly maintained. Any man-made system requires maintenance and that is often the fatal flaw in major construction designs. The designs are fine, but the follow-up is insufficient or non-existent. Supposedly, we have traps like the ones illustrated in the mechanical drawings (on the left) for all of our street drains, but if no one cleans the traps they were one more waste of taxpayer dollars.
It's not like all of this hasn't been reported to the city, county, and state in the past, but if you'd like to see what's really going on with our lake, now is the time to take a walk on the ice. Worst case, the lake is about 4' deep at the deepest spot right now. The water levels are probably 2' below where they were early last spring.
If we get the noise barriers and the construction of those barriers doesn't do more harm than good, the quality-of-life value of our lake could improve dramatically. It would be nice to get some of this street and freeway drainage problem solved at the same time so that the lake just doesn't slowly fill with sediment and become a mosquito breeding ground.